LaPine Elementary School - LEED Gold
Bend, Oregon
Provided mechanical and electrical engineering services for a new
42,000 square foot elementary school.
|
Rendering by BBT Architects |
| |
Westside Elementary School - LEED Gold
Bend, Oregon
Provided mechanical and electrical engineering services for a new
66,000 square foot elementary school. Included a 58kW Solar PV
system.
|
Photo by Bend/LaPine School District |
| |
Sherwood High School - LEED Gold
Sherwood, Oregon
Provided mechanical and electrical engineering services for a new
139,000 square foot combined elementary and middle school. Provided LEED
modeling and documentation.
|
| |
Sherwood Elementary/Middle School - LEED Gold
Sherwood, Oregon
Provided mechanical and electrical engineering services for addition
of 76,000 square feet and remodel of 37,000 square feet. Provided LEED
modeling and documentation.
|
| |
Tigard/Tualatin School District -Tigard High School
Tigard, Oregon
Photo by Gary Wilson Photo/Graphic |
Designed mechanical and
electrical systems for a 3 phase project for over 80,000
square feet of remodel and addition. Spaces include new
science classrooms, general classrooms, locker rooms,
library, music classrooms, pool, and portable
classrooms. |
|
| |
Roseburg School District - High School
Roseburg, Oregon
Photo by Gary Wilson Photo/Graphic |
Designed mechanical and electrical systems for locker rooms remodel
and addition, theater renovation, shop foundry modifications, science lab
remodel, library addition, and commons addition. |
|
| |
Tigard/Tualatin School District - Various School Improvements and
Additions
Tigard, Oregon
Various remodel and addition projects including Twality Middle School, Fowler
Middle School, Templeton Elementary School, Mary Woodward Elementary School,
Durham Elementary School. |
| |
Beaverton School District - Various School Improvements and Additions
Beaverton, Oregon
 |
Various projects including
Sunsent High School, Aloha High School, Five Oaks Middle School, Beaverton High
School, Sexton Mountain Elementary School, Bethany Elementary School,
Westview High School, Vose Elementary School, BSD Carpentry Shops. |
|
| |
Corvallis School District - Crescent Valley High School
Corvallis, Oregon
Designed mechanical and electrical system modifications including classrooms,
conversion of auto shop into new science classrooms, new HVAC DDC control
system, addition of new entry, remodel of administration area, and new emergency
generator.
|
| |
Amity School District - High School
Amity, Oregon
Designed mechanical and electrical systems for new 30,000 square foot
two-story addition including classrooms, vocational education shops, and
multi-purpose/cafeteria room with kitchen. Designed remodel of existing
4800 square foot shop building into art and music classrooms. Designed
fire sprinkler system for all new areas. Designed modifications of
electrical service for entire campus including new generator.
Designed variable air volume HVAC system using existing boiler. Designed
retrofit of existing gymnasium HVAC system to improve ventilation.
|
| |
Amity School District - Middle School
Amity, Oregon
Designed replacement of existing main electrical service, fire alarm
system, emergency egress lighting system including generator, and lighting
replacement in corridors, gym, and cafeteria. Designed new HVAC system for
library and computer room. Designed ventilation air system with heat
recovery for entire building.
|
| |
Amity School District - Elementary School
Amity, Oregon
Rebalanced existing HVAC system. Designed new fire alarm system and
emergency power system with generator for emergency lighting.
|
| |
Winston-Dillard School District
Winston, Oregon
Mechanical and Electrical design services for the following projects:
Winston Elementary School, Winston Middle School, Winston Middle
School Water Line Replacement, Douglas High School Electrical Service,
Douglas High School Science Building Addition, Lookingglass Elementary
School.
|
| |
Siuslaw School District Football/Track Field & Stadium
Florence, Oregon
Provided mechanical and electrical engineering services for a new
athletic field and associated grandstand facility, including field
lighting and concessions.
|
| |
Siuslaw Middle School
Florence, Oregon
Provided mechanical and electrical engineering services for a new
97,000 square foot middle school, including plumbing, HVAC, shop and
kitchen exhaust, interior and exterior lighting, site lighting, power,
electrical service, telephone & data provisions, intercom, paging, and
master clock systems.
|
| |
Newport Middle School
Newport, Oregon
Provided mechanical and electrical engineering services for a new middle
school.
|
|
|