All posts by admin

Daimler Trucks of North America Lighting Upgrades

Feasibility studies and design/specification for replacement of over 6000 inefficient metal halide and high pressure sodium high-bay fixtures, as well as T12 fluorescent task lighting, with T8 and T5HO fluorescent high-bay fixtures in a number of truck and parts manufacturing plants and distribution centers nationwide, saving around 50% of their lighting energy. Also includes occupancy sensors in storage areas.

Ridgeview High School – LEED Gold

ridgeview1

Mechanical, Electrical and Plumbing design for the new 276,000 square foot high school. Houses 32 classrooms, 17 labs, student collaboration areas, auditorium, video studio, and complete indoor and outdoor athletic facilities. Includes solar photovoltaic system and LED parking lot lighting.

Location: Redmond, Oregon

Mercedes Benz of Wilsonville

wilsonville_merc_2

Mechanical, Electrical, and Plumbing design for a new 86,000 square foot Mercedes Benz dealership. Includes showrooms, multiple level car storage, car wash, parts department, maintenance bays, and offices.

Location: Wilsonville, Oregon

Pamcorp Aircraft Hangars

pamcorp

Mechanical, Electrical, and Plumbing design for two wide-body aircraft maintenance hangars and supporting shops and offices covering a total of 300,000 square feet. Systems includes aircraft painting, AFFF fire protection systems, flammable vapor exhaust, four 5000 gpm fire pumps, compressed air, electrical utilities in Class 1 Div 1 in-floor service pits.

Location: Portland International Airport, Portland, Oregon